Location
Advice to choose the best technical and economic place.
Advice on electrical infrastructure for the load center to be installed in the company.
Advice on paperwork before the CENACE.
Carrying out the calculations for the 3 studies before CENACE.
Advice for the agency before the CFE distribution and transmission.
Engineering
Engineering for the particular substation load center.
Engineering for the substation control panel.
Engineering authorization with CFE transmission.
Medium voltage engineering for the construction process of the plant.
Legal Advice
Management and legal advice.
Management and consulting of rights of way.
Land demarcation and topography.
Appraisals.
Legal area.
Supreme Court of Justice (Regularization of Documents)
Public property registry
Final release letter and bond with CFE and CENACE.
Construction
Construction of lines and High transmission substations 115, 230, 400 Kv.
Installation of medium and low voltage power lines (5,000 to 34,000 V)
Experts in installations: Civil, Electrical, Telecommunications, Electrical Testing, Video Surveillance, Access, Intercom and Fiber Optic.
Release
Verification unit for electrical installations.
Inspection unit for load centers in accordance with the law of the electrical industry.